Portfolio – Kwality Shutters https://kwalityshutters.com Manufacturers of Hydro-Mechanical Equipments Sat, 23 Oct 2021 08:22:55 +0000 en hourly 1 https://wordpress.org/?v=5.3.13 https://kwalityshutters.com/wp-content/uploads/2018/10/cropped-sample2-32x32.png Portfolio – Kwality Shutters https://kwalityshutters.com 32 32 PELANDURAI ANICUT https://kwalityshutters.com/portfolio/pelandurai-anicut/ Sat, 23 Oct 2021 08:22:55 +0000 https://kwalityshutters.com/?post_type=portfolio&p=1595 Project Description
  • Erection of new shutter  and  composite chequered plate platform
  • Manufacture of composite hoist and chequered plate.

Duration : 2020 – 2021

]]>
SHENBAGATHOPE https://kwalityshutters.com/portfolio/shenbagathope/ Sat, 23 Oct 2021 08:15:53 +0000 https://kwalityshutters.com/?post_type=portfolio&p=1591 Project Description
  • Design, Manufacturing, supply, erection, modification, testing and commissioning of spillway Radial gate

Duration : 2020 – 2021

]]>
ADHANUR KUMARAMANGALAM https://kwalityshutters.com/portfolio/adhanur-kumaramangalam/ Sat, 23 Oct 2021 08:10:47 +0000 https://kwalityshutters.com/?post_type=portfolio&p=1588 Project Description
  • Design, procurement, fabrication, transport to site, erection, commissioning & maintenance for 5 years of the gates for 84 vents in the new regulator at Adhanur Kumaramangalam

Duration : 2019 – 2020

]]>
PARAMBIKULAM DAM https://kwalityshutters.com/portfolio/parambikulam-dam/ Sat, 23 Oct 2021 07:50:54 +0000 https://kwalityshutters.com/?post_type=portfolio&p=1585 Project Description
  • Rehabilitation and improvement of Trash rack at L.S.4000 ft & SPT.

Duration : 2019 – 2020

]]>
KALLANAI https://kwalityshutters.com/portfolio/kallanai/ Sat, 23 Oct 2021 07:45:48 +0000 https://kwalityshutters.com/?post_type=portfolio&p=1582 Project Description
  • Rehabilitation of old corroded shutter arrangements

Duration : 2018 – 2019

]]>
KANNANKOTTAI https://kwalityshutters.com/portfolio/kannankottai/ Fri, 22 Oct 2021 07:35:07 +0000 https://kwalityshutters.com/?post_type=portfolio&p=1578 Project Description
  • Design, fabrication, Supply & erection of shutter & Monorail arrangement

Duration : 2018 – 2019

]]>
MANIMUKTHANADHI DAM https://kwalityshutters.com/portfolio/manimukthanadhi-dam/ Fri, 22 Oct 2021 07:29:21 +0000 https://kwalityshutters.com/?post_type=portfolio&p=1575 Project Description
  • Design, fabrication, erection of new additional spillway gate.

Duration : 2018 – 2019

]]>
KRISHNAGIRI DAM https://kwalityshutters.com/portfolio/krishnagiri-dam/ Fri, 22 Oct 2021 07:22:44 +0000 https://kwalityshutters.com/?post_type=portfolio&p=1572

Project Description

  • Design, Fabrication, Erection of new vertical gate of size of 12950x6100mm- vent no 1
  • Metalizing with special alloy (ZnAl 15)
  • Semi flexible spillway gate.

Duration : 2018 – 2019

]]>
ANAIKARAI SOUTH https://kwalityshutters.com/portfolio/anaikarai-south/ Fri, 22 Oct 2021 07:01:08 +0000 https://kwalityshutters.com/?post_type=portfolio&p=1566 Project Description
  • Repair of existing gates of size 10200x2700mm with electrical operation.

Duration : 2016 – 2017

]]>
BHAVANISAGAR DAM https://kwalityshutters.com/portfolio/bhavanisagar-dam-2/ Thu, 21 Oct 2021 10:52:29 +0000 https://kwalityshutters.com/?post_type=portfolio&p=1562 Project Description
  • Surface Protective treatment in different stages
    1. Blast cleaning as per SA 2 ½
    2. Primer coat epoxy based zinc primer 50µ
    3. Tertiary coat of coal tar epoxy of 250µ

Duration : 2015 – 2016

]]>